DMC Houston Office Expansion Is Underway
After first expanding to Houston in August 2015, DMC settled into a cozy office space on Richmond Ave. in the Upper Kirby district. Since then, we've had more engineers (and an extra-large dog) join in the fun at DMC Houston. We needed more space… Intro: Houston Office Expansion!
Ch-ch-changes
We’re expanding our kitchen to take over the old, small conference room and open up the space. Our new conference room will be a massive 14’x18’ beauty at the back of the office space with a window that will look out into the second workspace area. This second workspace, by the way, DOUBLES the engineer capacity here in Houston. Finally, we’re also adding a second collaboration space.
Construction is underway right now and should be finished this spring in time for our Houston Yearly Office Event (YOE). During the YOE, people from other DMC offices will visit to experience amazing Texas things like honky-tonks, river rafting, and mouth-watering BBQ. Pictures of the construction space are below.
Office Layout: Old and New
Expanded Kitchen Space
Second Workspace
Outside the Collab Space (left) and Conference Room (right)
Stay tuned for an update on the office and Houston YOE 2017!
Comments
There are currently no comments, be the first to post one.